displayport interface testing challenges
displayport transmitter compliance testing presents several challenges that can complicate the verification process:
- time-consuming test setup: manually setting up a compliance testing can be a lengthy process and be prone to error.
- hardware and software requirements: identifying the necessary hardware, software and accessories for effective testing can be complex and confusing.
- source output configuration: properly configuring the displayport device under test (dut) source output is critical for compliance testing but can be challenging to manage.
- embedding and equalization operations: effectively operating embedding and equalization settings requires a deep understanding of the technology and its implications on signal integrity.
- root cause analysis for compliance failures: when compliance tests fail, conducting a thorough root cause analysis to identify and resolve issues can be a daunting task.